The Sarai Kale Khan Metro Station project is nearing completion and is designed to be a major transportation hub connecting the Rapid Rail Transit System (RRTS) with the Delhi Metro’s Pink Line, the Hazrat Nizamuddin Railway Station, and the inter-state bus terminal. Construction of the large, multi-modal station is advanced, with its size at 215 meters long, 50 meters wide, and 15 meters high, and it is equipped with numerous elevators and escalators. The station is 215 meters long, 50 meters wide, and 15 meters high, with six elevated platforms.
Auraa Construction
About Project
Challenges
The Sarai Kale Khan Metro Station project in Delhi, a major multi-modal transport hub connecting RRTS, Delhi Metro Pink Line, Hazrat Nizamuddin Railway Station, and the inter-state bus terminal, faced challenges of accommodating structural movement, thermal expansion, and high passenger and train loads. The large station dimensions (215 m × 50 m × 15 m) required reliable, durable expansion joints to ensure smooth operation, structural safety, and long-term maintenance efficiency.
Our Solutions
OMEGA Seal Expansion Joints (GN) provided a high-performance, flexible solution to absorb structural movement, thermal expansion, and dynamic loads from trains and passenger activity. Their durability and adaptability ensured leak-proof performance and minimal maintenance over time. This solution enabled Auraa Construction to deliver a safe, reliable, and long-lasting infrastructure solution for Sarai Kale Khan Metro Station, supporting seamless multi-modal connectivity and operational efficiency.
