Project Scope:
- Length: 12.915 km
- Stations: 13 elevated metro stations (tentative names: Bhadbhada Chauraha, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, J K Road, Indrapuri, Piplani, and Ratnagiri Tiraha).
- Timeline: The project is expected to be completed in 36 months.
Detailed Scope of Work:
The project includes designing and constructing critical infrastructure components such as foundations, viaduct piers, platforms, station concourses, technical rooms, entry/exit structures, and FOBs. The contractor is also responsible for:
- Geotechnical soil investigations at pier locations.
- Rail-Structure Interaction (RSI) studies.
- Coordination with design verification engineers (DVE) for design approvals.
- Aesthetic design ensures a balance between heritage, culture, and modernity.
- Addressing utilities and foundation designs near existing infrastructure like PWD flyovers.
The project emphasizes advanced design, structural aesthetics, and compliance with statutory approvals from Indian Railways and municipal authorities to minimize urban disruption.